PROJECT BACKGROUND
Ealing Hospital is a large acute hospital sited in Southall, London. It has many complicated and integrated water systems which fall under the required control of legislation and the Healthcare Technical Memorandums (HTMs).
The hospital provides services for a wide spectrum of patients from high dependency; immunosuppressed to day patients and A&E services. The water systems require an assessment of risk and an application of control.
OUR APPROACH
NIFES initially quantified the systems at Ealing hospital which fell under the control of legislation and the Healthcare Technical Memorandums (HTM’S). Detailed schematic drawings were produced enabling NIFES to conduct a risk assessment of all services from the hospitals cold water inlet to all outlets.
NIFES initially quantified the systems at Ealing hospital which fell under the control of legislation and the Healthcare Technical Memorandums (HTM’S). Detailed schematic drawings were produced enabling NIFES to conduct a risk assessment of all services from the hospitals cold water inlet to all outlets.
The risk assessment took into consideration all requirements of BS: 8580, HSE’s – L8 and those specific to Healthcare organisations. The findings of the assessment were delivered in a detailed document, highlighting all categories of risk, remedial actions required and time scales; these formed the basis of the now adopted Estates Action Plan.
A Written Scheme of Control was produced, enabling Ealing Hospital to manage their water systems; this has been incorporated into their daily PPM schedules. The Health & Safety implications of the systems maintenance, was also assessed and the risks associated highlighted.
SUMMARY
Project Results
Ealing Hospital now has:
Up to date schematic drawings of the installed water systems and its associated components
A detailed risk assessment of all water systems and all associated components.
Highlighted risks categorised with apportioned timescales and ratings
An Estates Action Plan showing all risks found and remedial work required to mitigate each risk
A Written Scheme of Control enabling Ealing Hospital management of their water systems
Highlighted risks of the maintenance activities associated with their water systems